To specify a left-hand or right-hand busway end tap box, match the manufacturer’s reference view to the exact busway end being connected. Record the choice on a marked drawing, with cable entry and access requirements stated separately.
The buyer and supplier need to read that arrangement the same way. A bare “LH” or “RH” note leaves room for conflicting interpretations; a drawing gives both sides a defined connection to review.
Key Takeaways
- Use the reference view and connection details for the specific busway series to confirm left-hand or right-hand orientation.
- Moving to the other side of an installed box changes your view; it does not change the product’s handedness.
- State cable entry, door opening, meter location, and installation position separately from the busway connection direction.
- Release the order against an agreed drawing, clear dimensional references, and a defined supply scope. Keep unresolved orientation details pending.
What Left- and Right-Hand Mean on an End Tap Box
An end cable tap box connects cables at the end of a busway run. It differs from a plug-in tap-off unit fitted to an outlet along the run. “End” describes the connection location; the box can serve the beginning or end of a run as its design and application allow.
For products offered in left-hand and right-hand versions, handing identifies a connection arrangement within that product family. Use the manufacturer’s drawings and labels to establish its meaning before applying a convention learned from another series.
Also identify what “left” modifies. A left-side cable opening, left-hinged door, or left-side meter does not establish the handedness of the busway connection. An older Siemens XJ-L catalog, for example, treats end tap box handing and meter surface as separate selection fields.
Other ranges use different configuration names. ABB’s 2025 ReliaGear guide, for example, shows standard and inverted end tap box positions with lug-direction and phase-side markings. If a catalog has no LH/RH option, specify its actual configuration name and catalog number, supported by the drawing. Do not assign a left-hand or right-hand equivalent yourself.
Use the same terminology on the request, drawing, and quotation. If a supplier uses “end feed box” for the item, check its connection drawing before treating that name as equivalent.

How to Confirm the Orientation Before Ordering
Keep one marked site layout beside the product drawing as you work through these checks.
Establish the Manufacturer’s Reference View
Find the marks or drawing notes that define the front, top, or phase side for the exact series. A door facing the aisle does not automatically establish the manufacturer’s front reference. For U.S. workplace installations subject to OSHA 1910.303, follow the instructions included in the equipment’s listing or labeling.
On the site layout, mark the product’s reference side and viewing direction, for example, “from the service aisle toward Wall W1.” On the connection-face drawing, state whether the view is from outside or inside the enclosure. Opposite views can reverse the apparent opening and hole pattern.
For vertical busway, include an elevation showing the connection height and orientation. “Left side of the room” is useful location information, but it needs a drawing reference before it can define a product selection.
Work Through a Labeled Product Example
Eaton’s Pow-R-Trak design guide, DG017004EN, effective February 2020, offers separate left-hand and right-hand end cable tap boxes. Figure 24.3-8 is labeled left-hand, although the busway connection appears on the right of the illustration. The side occupied by the connection in a picture is therefore not a reliable naming rule.
The guide defines the front with an F mark and places the factory-installed bridge joint at the left end of a straight section when viewed from that front. This identifies the straight section’s joint location; it does not, by itself, select the tap box’s handedness.
To apply the example, mark the F-reference side and the intended connection end on your layout. Compare that end’s mating arrangement with the tap box drawing, then ask the supplier to confirm the matching orientation and catalog number against current ordering information. If the confirmed arrangement matches the left-hand version, record that designation against the marked layout and the relevant manufacturer drawing.

Verify the Interface and Conductor Positions
Match the busway manufacturer, series, nameplate information, and selected connection end. Review the actual mating arrangement, including the joint or connector required between the box and busway. Similar-looking housings are not enough to establish busway-system compatibility.
Check the conductor identification on the assembly drawings: phases, neutral where provided, and the grounding arrangement. Follow the documented configuration; conductor order and the use of a separate ground bar vary between systems.
For Pow-R-Trak, Eaton requires the F marks to align and warns that misalignment puts phase bars out of sequence. The LH/RH designation alone does not verify electrical phase sequence.
For an existing run with missing records, obtain the identification and interface details before selecting a replacement. Have qualified electrical personnel handle any inspection that requires opening equipment. In U.S. workplaces, follow the applicable OSHA electrical safe-work requirements.
Check Cable Entry and Service Access
With the connection arrangement established, check the space around it. Allow for the cable’s bending requirements, the internal room needed to terminate conductors, and the external room needed to use tools or remove covers. These are separate constraints; one overall enclosure dimension cannot describe all three.
Check which panels actually come off. Schneider Electric’s ETBMB guidance states that both sides and the end opposite the busway stub are removable. That detail is useful for the identified product, but the covers on another series must be checked separately.
Map the removal path against walls, supports, and nearby services. Include any door swing and the approach needed to reach the terminals. A box can fit within the available space while leaving poor access for termination or later service.
For enclosure-only orders, have the assembly designer identify which cutouts, brackets, or mounting points change between hands before requesting a mirrored shell. Confirm which parts can be shared, with busbar, joint, and grounding changes addressed by the electrical assembly designer. Eabel’s customized enclosures offer options for box size, gland plates, cutouts, and mounting plates based on the agreed interface drawing.

Confirm Whether Rotation or Reversal Is Allowed
Check the exact model’s installation documents before treating rotation or reversal as an option. If the proposed position is not clearly covered, obtain a technical clarification and an updated drawing where needed. Any statement that a box is reversible should identify the allowed position, connection arrangement, and required parts.
A removable cover does not establish that the complete box can be reversed. Do not assume a 180-degree turn converts a left-hand product into an approved right-hand version, or plan field changes to the busbars to make it fit.
Schneider Electric’s I-Line 800–5000 A catalog gives a specific outdoor limitation. The edgewise and flatwise outdoor end cable tap boxes covered there are not interchangeable in the field. For an outdoor order, confirm the approved mounting configuration and enclosure rating together.
If the reference view or mating interface remains unresolved, mark the orientation “pending confirmation” and identify the missing information. This gives the supplier a specific question to resolve before production.
What to Include in the Orientation Specification
Agree on the enclosure supply scope and identify who is responsible for the finished electrical assembly. Mechanical fit alone does not confirm electrical compatibility or certification coverage. UL’s UL 857 overview for busways and associated fittings provides background on the standard. For projects specifying UL 857, obtain documentation of the applicable certification coverage for the selected finished configuration.
Use one schedule to record the agreed details and any supplier exceptions.
| Specification item | What to specify and confirm |
|---|---|
| Busway and connection end | Manufacturer, series, current and voltage ratings, relevant nameplate details, and the project’s connection-end identifier. |
| Reference view | A marked layout or elevation showing the observation arrow, product reference marks, and a fixed site landmark. |
| Handing and mounting position | The manufacturer’s configuration designation, catalog number or approved custom drawing, and installed arrangement, confirmed before fabrication release. |
| Mechanical interface and dimensions | Connection opening, mounting pattern, units, and measurement reference. State whether dimensions run from the enclosure edge to the joint centerline or another defined point or surface. |
| Conductor configuration | The applicable phase, neutral, and grounding drawing, reviewed by the party responsible for the electrical assembly. |
| Cable entry and access | The entry face, cover-removal path, and service space checked against the site arrangement. |
| Supply boundary | Included and excluded parts, with responsibility for the joint, busbars, lugs, and other applicable items identified. |
| Drawing control | Drawing number, revision, approval status, and supplier acknowledgment. For mixed LH/RH orders, assign each configuration its own identifier, drawing reference, and quantity. Resolve exceptions before release. |
| Physical confirmation | Part identification, orientation marking, and requested first-piece or shipment photos matched to the accepted drawing. Record which configuration each sample approval covers. Electrical checks remain separate. |
The following RFQ uses illustrative project tags. Replace them and the bracketed field with your project details before issuing it.
“Please quote one enclosure-only end tap box, tag ETB-01, for busway BW-01 at connection end E1. Use drawing ETB-01, revision C, reference view V1, and the attached orientation schedule. State the confirmed orientation as [manufacturer designation] and identify the applicable busway model and interface drawing. Cable entry is on marked face CE1; service access is from face S1. List excluded connection parts and any deviations before fabrication. Submit a revised drawing for approval before changing the orientation.”

FAQs About Busway End Tap Box Orientation
How do I identify a left-hand or right-hand busway end tap box?
Use the manufacturer’s reference view and drawing for the exact busway series. Match the marked reference side and intended connection end, then confirm the orientation and part number with the supplier. A photo alone can be misleading.
Does left-side cable entry mean I need a left-hand end tap box?
No. Cable-entry side, door opening, and busway-connection orientation are separate specifications. Mark each on the installed-view drawing so the supplier knows exactly what “left” refers to.
Can a left-hand busway end tap box be converted to right-hand?
Only if the manufacturer permits the conversion for that exact model. Rotating the box or removing a cover does not establish that it will work. Confirm the approved arrangement and any required replacement parts before planning a field change.
What should I send for a replacement busway end tap box quote?
Provide the busway manufacturer, series, nameplate photo, and a marked layout identifying the connection end. Include verified interface dimensions, cable-entry location, service access, and whether you need the enclosure alone or the complete assembly.
Can I order only the enclosure for a busway end tap box?
Yes. Specify the housing, cutouts, brackets, and mounting plates required by the approved drawings. Identify who supplies the joint, busbars, lugs, and grounding components. Confirm electrical compatibility and certification coverage separately from enclosure dimensions.
How should I order left-hand and right-hand end tap boxes together?
List each configuration separately, with its own identifier, orientation designation, drawing revision, and quantity. Record which version each first-piece approval covers, and match shipment labels to those identifiers to reduce installation mix-ups.
Conclusion

Before fabrication, confirm that the manufacturer’s orientation designation matches the intended busway end, reference view, and accepted drawing. This gives the supplier a clear basis for checking the configuration and flagging exceptions. Contact us with your busway model, marked site photos or layout, and whether you need an enclosure only or a complete assembly. Those details provide a clear starting point for discussing your end tap box enclosure requirements and the supply scope for your project.