{"id":70672,"date":"2026-09-10T02:56:20","date_gmt":"2026-09-10T02:56:20","guid":{"rendered":"https:\/\/www.eabel.com\/?p=70672"},"modified":"2026-09-11T06:00:44","modified_gmt":"2026-09-11T06:00:44","slug":"three-phase-panelboard-specifications","status":"publish","type":"post","link":"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/","title":{"rendered":"\u0e04\u0e39\u0e48\u0e21\u0e37\u0e2d\u0e02\u0e49\u0e2d\u0e01\u0e33\u0e2b\u0e19\u0e14\u0e41\u0e1c\u0e07\u0e08\u0e48\u0e32\u0e22\u0e44\u0e1f\u0e2a\u0e32\u0e21\u0e40\u0e1f\u0e2a"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"70672\" class=\"elementor elementor-70672\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1594495 e-flex e-con-boxed e-con e-parent\" data-id=\"1594495\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5ee7d3c elementor-widget elementor-widget-text-editor\" data-id=\"5ee7d3c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"p1\">A request for a \u201c400A, three-phase panelboard with 42 circuits\u201d may sound complete, but it leaves critical questions unanswered. The supplier still needs the system voltage, wire configuration, main and bus ratings, breaker layout, short-circuit current rating, neutral arrangement, enclosure Type, and certification scope.<\/p>\n<p class=\"p1\">Accurate three-phase panelboard specifications must describe a coordinated electrical assembly\u2014not just amperage and circuit count. This guide explains how to select the main ratings, verify fault-current performance, resolve conflicts between project documents, and prepare a quote-ready specification.<\/p>\n<p class=\"p1\">This guide focuses on low-voltage panelboards used in North American commercial and industrial systems. IEC-based markets use different terminology, product standards, and conformity procedures.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-30fff4f e-flex e-con-boxed e-con e-parent\" data-id=\"30fff4f\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-cccc58b elementor-widget elementor-widget-text-editor\" data-id=\"cccc58b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Key Takeaways<\/h2>\n<ul>\n<li>Confirm the voltage, phase, wire, and source configuration before selecting the panelboard.<\/li>\n<li>State the feeder conductor ampacity, upstream protection, main-device, and bus ratings separately.<\/li>\n<li>Provide a breaker schedule instead of relying on circuit count alone.<\/li>\n<li>Require the marked panelboard SCCR to equal or exceed the available fault current at the specified voltage.<\/li>\n<li>Compare the final supplier submittal with the project drawings, specifications, and fault-current requirements.<\/li>\n<\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-700e572 e-flex e-con-boxed e-con e-parent\" data-id=\"700e572\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-648e48b elementor-widget elementor-widget-text-editor\" data-id=\"648e48b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>What Specifications Define a Three-Phase Panelboard?<\/h2><p class=\"p1\">A three-phase panelboard receives power from a three-phase feeder and distributes it to branch circuits through a common bus and protective devices. For a broader overview of equipment roles and layouts, see this guide to <strong><a href=\"https:\/\/www.eabel.com\/understanding-distribution-panels-functions-components-and-importance\/\" target=\"_blank\" rel=\"noopener noreferrer\">distribution panel components and selection<\/a><\/strong>.<\/p><p class=\"p1\">In North America, a load center is often a smaller, more standardized type of panelboard rather than a separate code category. Product flexibility, breaker systems, ratings, and procurement methods create the practical differences.<\/p><p class=\"p1\">A switchboard may be more suitable when the design needs multiple sections, larger feeder devices, extensive metering, or more cable space. The choice should follow the distribution architecture rather than one ampere threshold.<\/p><div style=\"overflow-x: auto; max-width: 100%;\"><table><thead><tr><th>Specification<\/th><th>What to Confirm<\/th><th>Why It Matters<\/th><\/tr><\/thead><tbody><tr><td>Electrical system<\/td><td>Voltage, phase, wires, frequency, and source configuration<\/td><td>Determines bus, breaker, neutral, and load compatibility<\/td><\/tr><tr><td>Main configuration<\/td><td>Main breaker or main lugs only<\/td><td>Affects protection, disconnecting, space, and cost<\/td><\/tr><tr><td>Main and bus ratings<\/td><td>State each value separately<\/td><td>Prevents feeder, main, and bus capacity from being confused<\/td><\/tr><tr><td>Branch schedule<\/td><td>Breaker amperes, poles, quantity, and load<\/td><td>Determines the actual interior layout<\/td><\/tr><tr><td>Neutral and ground<\/td><td>Capacity, isolation, bonding, and terminals<\/td><td>Controls the normal current path and grounding arrangement<\/td><\/tr><tr><td>Fault-current rating<\/td><td>Available fault current and required SCCR<\/td><td>Confirms suitability at the installation point<\/td><\/tr><tr><td>Enclosure<\/td><td>NEMA Type, material, mounting, and cable entry<\/td><td>Matches the installation environment<\/td><\/tr><tr><td>Listing and documents<\/td><td>Required assembly certification, markings, and drawings<\/td><td>Confirms the delivered equipment meets the specified scope<\/td><\/tr><\/tbody><\/table><\/div><h2>1. Match the Panelboard to the Electrical System<\/h2><p class=\"p1\">Voltage must be confirmed before choosing the panelboard interior or breaker family. Writing only \u201c208V three-phase\u201d or \u201c480V three-phase\u201d does not fully describe the source.<\/p><p class=\"p1\">A 208Y\/120V system provides 208V phase to phase and 120V phase to neutral. It is common in commercial buildings that need three-phase equipment, 208V line-to-line loads, and 120V receptacles or lighting.<\/p><p class=\"p1\">A 480Y\/277V system provides 480V phase to phase and 277V phase to neutral. It is often used for larger motors, HVAC equipment, and compatible lighting. Lower-voltage receptacles are commonly supplied through a transformer and a downstream 208Y\/120V panelboard.<\/p><p class=\"p1\">Do not assume that every \u201c480V three-phase\u201d system is 480Y\/277V. It may be a three-wire system without a neutral or another source configuration. Confirm the one-line diagram, transformer connection, system conductors, and line-to-neutral loads.<\/p><p class=\"p1\">In a three-phase, four-wire designation, the four system conductors are normally three phase conductors and one neutral. The equipment grounding conductor is not counted. A three-phase, three-wire system normally has no neutral for line-to-neutral loads, although it still requires an effective equipment grounding path.<\/p><p class=\"p1\">Breaker voltage markings must match the grounding configuration. A 480Y\/277V slash-rated breaker is intended for systems where no conductor exceeds 277V to ground and the line-to-line voltage does not exceed 480V. It is not suitable where a conductor can be exposed to 480V to ground, as can occur on 480V delta, ungrounded, or impedance-grounded systems; those applications generally require straight 480V-rated equipment identified for the system.<\/p><p class=\"p1\">Wye, delta, corner-grounded delta, and high-leg delta systems are not interchangeable. A high-leg delta system, for example, requires the correct phase arrangement, markings, and compatible branch devices. If the source is unclear, selection should stop until the project team confirms it.<\/p><p class=\"p1\">If a panelboard can be energized by a generator, PV system, battery system, or another secondary source, identify every source and operating mode before selection. Confirm the direction of power flow, back-fed breaker provisions, required hold-down devices, interlocks or transfer equipment, bus loading, fault-current contribution, and power-control-system settings where applicable.<\/p><p><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter wp-image-65366\" title=\"Industrial panelboard showing step by step sizing components\" src=\"http:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Industrial-panelboard-showing-step-by-step-sizing-components.webp\" alt=\"Industrial panelboard showing step by step sizing components\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Industrial-panelboard-showing-step-by-step-sizing-components.webp 512w, https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Industrial-panelboard-showing-step-by-step-sizing-components-500x334.webp 500w, https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Industrial-panelboard-showing-step-by-step-sizing-components-18x12.webp 18w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p><h2>2. Calculate the Load and Select Main and Bus Ratings<\/h2><p class=\"p1\">Panelboard sizing should start with the project load calculation, not the sum of breaker handle ratings. Apply connected-load and demand calculations, continuous-load and motor requirements, intermittent loads, and planned expansion under the locally adopted edition of <strong><a href=\"https:\/\/www.nfpa.org\/codes-and-standards\/nfpa-70-standard-development\/70\" target=\"_blank\" rel=\"noopener noreferrer\">NFPA 70, the National Electrical Code<\/a><\/strong>. A three-phase kVA-to-current conversion can check a balanced load, but it cannot determine panelboard size because it does not address conductor ampacity, voltage drop, or protective-device coordination.<\/p><p class=\"p1\">Several current values are often confused. The calculated load, feeder conductor ampacity, upstream feeder overcurrent-device rating, integral main-device rating, and panelboard bus rating should be stated separately. In an MLO panelboard, the upstream protective device protects the feeder and panelboard, but it is not an integral main-device rating.<\/p><p class=\"p1\">These values can differ. A panelboard may have a 400A bus and a 300A main breaker. The larger bus can support a standard product platform or future expansion, but it does not increase the capacity of the 300A main or feeder.<\/p><p class=\"p1\">Expansion also has several limits. Empty pole positions do not prove that the bus has spare ampacity. Spare bus capacity does not prove that the upstream transformer or feeder can support more load. Larger future breakers may also require more cable and bending space. Expansion allowances should follow a realistic plan rather than an arbitrary percentage presented as a code rule.<\/p><p class=\"p1\"><a href=\"https:\/\/www.eabel.com\/busbar-power-distribution\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Copper and aluminum bus<\/strong><\/a> can both be suitable when properly designed and evaluated. Copper has higher conductivity by volume but is heavier and usually more expensive. Aluminum often needs a larger cross-section. Joint design, plating, supports, breaker interfaces, and thermal performance matter more than the material name alone.<\/p><h2>3. Select Main, Branch, and Short-Circuit Protection<\/h2><p class=\"p1\">A main breaker panelboard includes an integral overcurrent protective device ahead of the bus. It also provides a convenient local disconnect. However, a main breaker does not automatically make the panelboard suitable for use as service equipment. Service use requires the correct construction, bonding provisions, disconnect arrangement, and markings.<\/p><p class=\"p1\">A main-lug-only panelboard has incoming lugs but no integral main breaker. It relies on an upstream protective device. MLO does not mean small, low-current, or automatically a subpanel. The choice depends on the one-line architecture, upstream protection, local disconnect requirements, and maintenance needs.<\/p><p class=\"p1\">The load schedule must then be converted into a physical breaker layout. A single-pole breaker normally uses one pole position, a two-pole breaker uses two, and a three-pole breaker uses three. Large-frame branch breakers may need a different interior even when enough small-breaker spaces appear available.<\/p><p class=\"p1\">\u201c42 circuits\u201d is not a complete specification because it does not identify breaker poles, frame sizes, or spare positions. The NEC no longer imposes the former blanket 42-device limit; the panelboard\u2019s listed configuration, approved breaker types, and actual pole schedule determine its capacity.<\/p><p class=\"p1\">Breaker manufacturer and family matter because similar dimensions do not establish interchangeability. The bus connection, mounting system, voltage rating, interrupting rating, terminals, and panelboard listing must support the exact device; consult the <strong><a href=\"https:\/\/www.ul.com\/thecodeauthority\/knowledge\/circuit-breaker-guide\" target=\"_blank\" rel=\"noopener noreferrer\">UL molded-case circuit-breaker marking and application guide<\/a><\/strong> before approving a substitution.<\/p><p><img decoding=\"async\" class=\"aligncenter wp-image-65365\" title=\"Wired panelboard setup showing breakers and circuit connections\" src=\"http:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Wired-panelboard-setup-showing-breakers-and-circuit-connections.webp\" alt=\"Wired panelboard setup showing breakers and circuit connections\" width=\"500\" height=\"281\" srcset=\"https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Wired-panelboard-setup-showing-breakers-and-circuit-connections.webp 1200w, https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Wired-panelboard-setup-showing-breakers-and-circuit-connections-500x281.webp 500w, https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Wired-panelboard-setup-showing-breakers-and-circuit-connections-18x10.webp 18w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p><p class=\"p1\">After the device layout is known, verify short-circuit performance. Available fault current is the prospective current that could reach the panelboard during a short circuit. It depends on the source, transformer kVA and impedance, conductor size and length, parallel conductors, upstream equipment, and system voltage.<\/p><p class=\"p1\">A circuit breaker has an interrupting rating, often called AIC in commercial discussions. The complete panelboard has a short-circuit current rating, or SCCR. A panelboard containing one 65kA breaker is not automatically a 65kA panelboard.<\/p><p class=\"p1\">The marked panelboard SCCR must equal or exceed the available fault current at the installation point and at the applicable system voltage. UL explains that the rating considers both the protective devices\u2019 ability to interrupt fault current and the bus structure\u2019s ability to withstand the resulting forces. The overall rating may be limited by the lowest-rated installed device. See the <strong><a href=\"https:\/\/www.ul.com\/thecodeauthority\/knowledge\/panelboards-guide\" target=\"_blank\" rel=\"noopener noreferrer\">UL Panelboard Application Guide<\/a><\/strong>.<\/p><p class=\"p1\">Do not confuse the manufacturer-marked SCCR with the field-marked available fault current. Where the adopted NEC 408.6 applies, installations other than one- and two-family dwellings must show the available fault current and calculation date on a durable field label at the enclosure\u2019s point of supply. The project documents should assign responsibility for the calculation and label.<\/p><p class=\"p1\">In a fully rated system, each relevant overcurrent device has an interrupting rating suitable for the available fault current at its line terminals. A series-rated system uses a specific upstream and downstream device combination. For new equipment, use a tested and listed combination marked for the application. NEC 240.86(A) also permits engineered series ratings under documented engineering supervision for qualifying existing installations. Never infer a series rating from the individual interrupting ratings of convenient devices.<\/p><p class=\"p1\">A tested series-rated design must follow the manufacturer\u2019s published combination data and all marking and installation conditions. An engineered series rating requires documented calculations, engineering supervision, and the prescribed field marking. Changing a device family, manufacturer, or upstream device may invalidate the rating. Motor contribution must also be reviewed because it can prevent use of the proposed series combination.<\/p><p class=\"p1\">SCCR does not establish selective coordination or determine arc-flash incident energy. If the project requires a coordination study or arc-flash assessment, specify those deliverables separately and provide the final breaker types, trip settings, and upstream device data.<\/p><h2>4. Plan Phase Balance, Neutral, Ground, and Enclosure<\/h2><p class=\"p1\">Phase balancing should be based on expected load, not breaker count. Three 20A circuits drawing 15A each place a different load on a phase than three 20A circuits drawing 2A each. The panel schedule should total the expected VA or current on phases A, B, and C and distribute single-phase loads accordingly.<\/p><p class=\"p1\">Where line-to-neutral loads are present, the neutral must be included in the electrical and physical design. Single-phase electronic loads such as LED drivers, computers, and some UPS loads can produce triplen harmonics that add in the neutral. Three-phase VFDs, EV chargers, and other power-electronic loads can affect harmonics, thermal performance, and protection even when they do not use the neutral.<\/p><p class=\"p1\">These conditions do not mean every commercial panelboard requires a 200% neutral. Neutral sizing should follow the load study, equipment listing, and engineer\u2019s requirements.<\/p><p class=\"p1\">Neutral and ground serve different purposes. The neutral carries normal load current. The equipment grounding path carries fault current and supports prompt operation of the protective device. In most <strong><a href=\"https:\/\/www.eabel.com\/main-panel-vs-sub-panel-key-differences-explained\/\" target=\"_blank\" rel=\"noopener noreferrer\">downstream panelboards<\/a><\/strong>, the neutral is isolated from the enclosure and equipment grounding bar.<\/p><p class=\"p1\">At service equipment, the grounded conductor and enclosure must be bonded as required by the system design, applicable code, and marked instructions. Separately derived systems also require the bonding point to be coordinated with the source.<\/p><p class=\"p1\">The enclosure must match the installation environment. Under the <strong><a href=\"https:\/\/www.nema.org\/docs\/default-source\/products-document-library\/nema-enclosure-types.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">official NEMA enclosure Type definitions<\/a><\/strong>, Type 1 is common in general indoor areas. Type 3R protects against outdoor rain but is not a hose-wash rating. Type 4 addresses more severe water exposure, while Type 4X adds corrosion protection. Type 12 is generally used indoors where dust, falling dirt, and dripping noncorrosive liquids are concerns.<\/p><p class=\"p1\">Material and enclosure Type are separate specifications. Stainless steel is not automatically NEMA 4X, and carbon steel is not automatically limited to Type 1. The complete construction\u2014including seams, doors, gaskets, openings, and hardware\u2014determines the environmental rating.<\/p><p class=\"p1\">Where the installation location has not been fixed, compare <strong><a href=\"https:\/\/www.eabel.com\/is-it-better-to-put-breaker-panels-inside-or-outside\/\" target=\"_blank\" rel=\"noopener noreferrer\">indoor and outdoor breaker-panel placement<\/a><\/strong> before specifying the enclosure Type.<\/p><p class=\"p1\">Also confirm surface or flush mounting, feed and conduit direction, incoming conductor material, size and quantity, lug range, terminal temperature rating, wire-bending space, enclosure dimensions, ambient temperature, and heat dissipation. An enclosure that fits every breaker can still be unsuitable if the specified conductors cannot terminate or bend within the available space.<\/p><p><img decoding=\"async\" class=\"aligncenter wp-image-65360\" title=\"Electrician performs panelboard installation with safety tips\" src=\"http:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Electrician-performs-panelboard-installation-with-safety-tips.webp\" alt=\"Electrician performs panelboard installation with safety tips\" width=\"500\" height=\"273\" srcset=\"https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Electrician-performs-panelboard-installation-with-safety-tips.webp 1408w, https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Electrician-performs-panelboard-installation-with-safety-tips-500x273.webp 500w, https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Electrician-performs-panelboard-installation-with-safety-tips-18x10.webp 18w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p><h2>5. Resolve Project Conflicts and Review the Submittal<\/h2><p class=\"p1\">Panelboard errors often begin when project documents disagree. The one-line diagram, panel schedule, equipment schedule, electrical specification, fault-current study, supplier quotation, and manufacturer submittal may have been prepared at different stages.<\/p><p class=\"p1\">A voltage conflict exists when the one-line shows 480Y\/277V while the panel schedule states \u201c480V, three-phase, three-wire.\u201d A rating conflict appears when the specification requires a 400A bus but the quotation lists only a 300A main breaker. A layout conflict exists when the schedule requests 42 circuits but the required one-, two-, and three-pole devices cannot fit the proposed interior.<\/p><p class=\"p1\">Fault-current language also causes mistakes. A study may require 65kA SCCR at the panel location, while the quotation states only that the main breaker has a 65kA interrupting rating. These statements are not equivalent. An environmental conflict can be just as serious, such as a NEMA 3R requirement for an area exposed to hose wash or corrosive chemicals.<\/p><p class=\"p1\">Do not silently choose the most convenient value. Record the conflict and request written clarification from the engineer of record or other responsible project authority. The controlling order of project documents depends on the contract and should not be invented by the supplier.<\/p><p class=\"p1\">The submittal review must compare the proposed assembly with the confirmed project requirements. Check the nameplate voltage, phase, wire configuration, frequency, main-device rating, bus rating, breaker family, pole schedule, and trip ratings.<\/p><p class=\"p1\">Verify the marked SCCR at the specified voltage and determine whether the design is fully rated or depends on a documented series combination. Review the neutral, ground bar, enclosure Type, mounting, cable-entry direction, dimensions, terminals, and wiring space.<\/p><p class=\"p1\">Certification must cover the delivered assembly and its intended use. UL 67 covers panelboards, while UL 489 applies to molded-case circuit breakers and related devices. Enclosure standards may also apply. These are different evaluation scopes; UL Listed components do not automatically make the completed panelboard UL Listed.<\/p><p class=\"p1\">If the specification requires equipment to be \u201clisted\u201d but does not name UL Solutions, confirm whether certification by another AHJ-accepted <strong><a href=\"https:\/\/www.osha.gov\/nationally-recognized-testing-laboratory-program\" target=\"_blank\" rel=\"noopener noreferrer\">Nationally Recognized Testing Laboratory<\/a><\/strong> to the applicable standard is permitted. The certification must still cover the completed assembly, not only its components.<\/p><p class=\"p1\">The equipment\u2019s primary function also matters. A panelboard, industrial control panel, and switchboard can contain some similar components but fall under different product categories.<\/p><p class=\"p1\">If the panelboard will serve as service equipment, verify the correct \u201cSuitable for Use as Service Equipment\u201d marking and associated construction. A main breaker alone does not establish service suitability.<\/p><p class=\"p1\">Standard catalog enclosures do not always provide the required breaker layout, cable-entry direction, conductor-bending space, or environmental protection. In these cases, buyers can review E-Abel\u2019s <strong><a href=\"https:\/\/www.eabel.com\/enclosures\/\" target=\"_blank\" rel=\"noopener noreferrer\">custom electrical enclosure options<\/a><\/strong> after confirming the panelboard interior, heat load, NEMA Type, wiring space, and certification responsibilities. Send the supplier the one-line diagram, panel schedule, fault-current data, and installation conditions so the proposed enclosure is based on verified requirements rather than assumptions.<\/p><p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-65359\" title=\"Electrician inspecting complex panelboard wiring and breakers\" src=\"http:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Electrician-inspecting-complex-panelboard-wiring-and-breakers.webp\" alt=\"Electrician inspecting complex panelboard wiring and breakers\" width=\"500\" height=\"333\" srcset=\"https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Electrician-inspecting-complex-panelboard-wiring-and-breakers.webp 2000w, https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Electrician-inspecting-complex-panelboard-wiring-and-breakers-500x333.webp 500w, https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Electrician-inspecting-complex-panelboard-wiring-and-breakers-1536x1022.webp 1536w, https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Electrician-inspecting-complex-panelboard-wiring-and-breakers-18x12.webp 18w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p><h2>6. Build a Quote-Ready Panelboard RFQ<\/h2><p class=\"p1\">A useful RFQ converts the project requirements into exact, reviewable fields. The example below is illustrative and must be adjusted to the actual electrical system.<\/p><div style=\"overflow-x: auto; max-width: 100%;\"><table><thead><tr><th>RFQ Field<\/th><th>Illustrative Requirement<\/th><\/tr><\/thead><tbody><tr><td>Application<\/td><td>Commercial building distribution panel<\/td><\/tr><tr><td>Electrical system<\/td><td>208Y\/120V, three-phase, four-wire, 60Hz<\/td><\/tr><tr><td>Main configuration<\/td><td>Main breaker panelboard<\/td><\/tr><tr><td>Main and bus<\/td><td>300A main breaker with 400A bus<\/td><\/tr><tr><td>Bus material<\/td><td>Aluminum bus; copper-bus alternate priced separately if permitted by the project specification<\/td><\/tr><tr><td>Branch devices<\/td><td>Attached schedule showing each load, breaker ampere rating, poles, interrupting rating, trip function, accessories, and quantity<\/td><\/tr><tr><td>Phase balance<\/td><td>Based on scheduled VA or expected current<\/td><\/tr><tr><td>Neutral and ground<\/td><td>Full-size isolated neutral and separate ground bar for downstream use<\/td><\/tr><tr><td>Short-circuit requirement<\/td><td>Available fault current: 42kA rms symmetrical at 208Y\/120V; required marked panelboard SCCR: 65kA minimum<\/td><\/tr><tr><td>Rating method<\/td><td>Fully rated unless an approved series combination is documented<\/td><\/tr><tr><td>Enclosure<\/td><td>NEMA Type 1, surface-mounted, indoor electrical room<\/td><\/tr><tr><td>Cable entry<\/td><td>Incoming feeder from bottom; branch conduits coordinated with drawings<\/td><\/tr><tr><td>Incoming conductors and terminals<\/td><td>State conductor material, size, number of sets per phase, neutral size, lug range, and terminal temperature rating<\/td><\/tr><tr><td>Certification<\/td><td>UL 67 Listed enclosed panelboard with the required nameplate and SCCR markings<\/td><\/tr><\/tbody><\/table><\/div><p class=\"p1\">Support the RFQ with the documents the supplier needs to verify these entries:<\/p><ul><li>Current one-line diagram<\/li><li>Load calculation, panel schedule, and breaker schedule<\/li><li>Available fault-current study or confirmed fault-current value<\/li><li>Installation drawings and environmental conditions<\/li><li>Governing electrical specifications and approved-alternate rules<\/li><li>Required submittal format, test records, quantity, and delivery schedule<\/li><\/ul><p class=\"p1\">If information is missing, identify it as requiring confirmation rather than allowing an undocumented assumption. A clear RFQ reduces quotation revisions, unsuitable substitutions, approval delays, and installation conflicts.<\/p><p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-65358\" title=\"Electrician checks key factors in proper panelboard sizing\" src=\"http:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Electrician-checks-key-factors-in-proper-panelboard-sizing.webp\" alt=\"Electrician checks key factors in proper panelboard sizing\" width=\"500\" height=\"305\" srcset=\"https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Electrician-checks-key-factors-in-proper-panelboard-sizing.webp 709w, https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Electrician-checks-key-factors-in-proper-panelboard-sizing-500x305.webp 500w, https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Electrician-checks-key-factors-in-proper-panelboard-sizing-18x12.webp 18w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p><h2>FAQs About Three-Phase Panelboard Specifications<\/h2>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a9ab6db elementor-widget elementor-widget-n-accordion\" data-id=\"a9ab6db\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;default_state&quot;:&quot;expanded&quot;,&quot;max_items_expended&quot;:&quot;one&quot;,&quot;n_accordion_animation_duration&quot;:{&quot;unit&quot;:&quot;ms&quot;,&quot;size&quot;:400,&quot;sizes&quot;:[]}}\" data-widget_type=\"nested-accordion.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"e-n-accordion\" aria-label=\"Accordion. Open links with Enter or Space, close with Escape, and navigate with Arrow Keys\">\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1770\" class=\"e-n-accordion-item\" open>\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"1\" tabindex=\"0\" aria-expanded=\"true\" aria-controls=\"e-n-accordion-item-1770\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> What information is needed to quote a three-phase panelboard? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-minus\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-plus\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1770\" class=\"elementor-element elementor-element-401c2fd e-con-full e-flex e-con e-child\" data-id=\"401c2fd\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-02e2d26 elementor-widget elementor-widget-text-editor\" data-id=\"02e2d26\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"PDq2pG_selectionAnchorContainer\" data-start=\"123\" data-end=\"455\">Provide the voltage, phase, wire configuration, calculated load, feeder and bus ratings, main breaker or MLO configuration, breaker schedule, available fault current, required SCCR, NEMA enclosure Type, cable entry, conductor sizes, and certification requirements. Include the one-line diagram and panel schedule whenever available.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1771\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"2\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1771\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Should I choose a 208Y\/120V or 480Y\/277V three-phase panelboard? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-minus\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-plus\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1771\" class=\"elementor-element elementor-element-bb7bcc6 e-con-full e-flex e-con e-child\" data-id=\"bb7bcc6\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-7bb0f6f elementor-widget elementor-widget-text-editor\" data-id=\"7bb0f6f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"PDq2pG_selectionAnchorContainer\" data-start=\"530\" data-end=\"791\">Choose the voltage that matches the confirmed source and connected loads. A 208Y\/120V panelboard can supply 120V and 208V loads, while a 480Y\/277V panelboard commonly serves 277V lighting and 480V motors or HVAC equipment. These systems are not interchangeable.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1772\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"3\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1772\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Can a three-phase panelboard have a 400A bus and a 300A main breaker? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-minus\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-plus\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1772\" class=\"elementor-element elementor-element-8951e40 e-con-full e-flex e-con e-child\" data-id=\"8951e40\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-871301f elementor-widget elementor-widget-text-editor\" data-id=\"871301f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Yes. The 400A bus identifies the bus capacity, while the 300A main breaker limits the panelboard\u2019s present input current. The larger bus may support a standard design or future modification, but it does not increase the capacity of the feeder or 300A main breaker.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1773\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"4\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1773\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> What SCCR should a commercial three-phase panelboard have? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-minus\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-plus\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1773\" class=\"elementor-element elementor-element-49b47b2 e-con-full e-flex e-con e-child\" data-id=\"49b47b2\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-e649b7d elementor-widget elementor-widget-text-editor\" data-id=\"e649b7d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The marked panelboard SCCR must equal or exceed the available fault current at the installation point and specified voltage. Do not use the main breaker\u2019s AIC alone\u2014the SCCR applies to the complete panelboard assembly.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1774\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"5\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1774\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> How many circuit spaces does a three-phase panelboard need? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-minus\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-plus\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1774\" class=\"elementor-element elementor-element-f96dca2 e-con-full e-flex e-con e-child\" data-id=\"f96dca2\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-91db2c4 elementor-widget elementor-widget-text-editor\" data-id=\"91db2c4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Count the required pole positions from the breaker schedule. Single-pole breakers normally use one position, two-pole breakers use two, and three-pole breakers use three. \u201c42 circuits\u201d is incomplete unless the breaker poles, frame sizes, and spare positions are also defined.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1775\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"6\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1775\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Does a custom panelboard enclosure make the assembly UL 67 Listed? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-minus\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-plus\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1775\" class=\"elementor-element elementor-element-c625f3e e-con-full e-flex e-con e-child\" data-id=\"c625f3e\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-ff95afd elementor-widget elementor-widget-text-editor\" data-id=\"ff95afd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"qMYqUG_convSearchResultHighlightRoot\"><div class=\"\" data-turn-id-container=\"request-WEB:4e6f25e0-ebd2-4cf0-a2d5-8baee07d43bc-19\" data-is-intersecting=\"true\"><section class=\"text-token-text-primary w-full focus:outline-none has-data-writing-block:pointer-events-none [&amp;:has([data-writing-block])&gt;*]:pointer-events-auto R6Vx5W_threadScrollVars scroll-mb-[calc(var(--scroll-root-safe-area-inset-bottom,0px)+var(--thread-response-height))] scroll-mt-[calc(var(--header-height)+min(200px,max(70px,20svh)))]\" dir=\"auto\" data-turn-id=\"request-WEB:4e6f25e0-ebd2-4cf0-a2d5-8baee07d43bc-19\" data-turn-id-container=\"request-WEB:4e6f25e0-ebd2-4cf0-a2d5-8baee07d43bc-19\" data-testid=\"conversation-turn-34\" data-turn=\"assistant\"><div class=\"text-base my-auto mx-auto pb-8 [--thread-content-margin:var(--thread-content-margin-xs,calc(var(--spacing)*4))] @w-sm\/main:[--thread-content-margin:var(--thread-content-margin-sm,calc(var(--spacing)*6))] @w-lg\/main:[--thread-content-margin:var(--thread-content-margin-lg,calc(var(--spacing)*16))] px-(--thread-content-margin)\"><div class=\"[--thread-content-max-width:40rem] @w-lg\/main:[--thread-content-max-width:48rem] mx-auto max-w-(--thread-content-max-width) flex-1 group\/turn-messages focus-visible:outline-hidden @[53.5rem]\/main:[--thread-content-max-width:48rem] relative flex w-full min-w-0 flex-col agent-turn\" data-conversation-screenshot-content=\"\"><div class=\"flex max-w-full flex-col gap-4 grow\"><div class=\"min-h-8 text-message relative flex w-full flex-col items-end gap-2 text-start break-words whitespace-normal outline-none keyboard-focused:focus-ring [.text-message+&amp;]:mt-1\" dir=\"auto\" tabindex=\"0\" data-message-author-role=\"assistant\" data-message-id=\"8fab2323-6b7b-51a8-95c1-8f32020c911f\" data-turn-start-message=\"true\" data-message-model-slug=\"gpt-5.6-sol-wm\"><div class=\"flex w-full flex-col gap-1 empty:hidden\"><div class=\"markdown prose dark:prose-invert wrap-break-word w-full light markdown-new-styling\"><p class=\"PDq2pG_selectionAnchorContainer\" data-start=\"1844\" data-end=\"2124\" data-is-last-node=\"\" data-is-only-node=\"\">No. A listed enclosure or UL Listed components do not automatically make the completed panelboard UL 67 Listed. The required certification must cover the finished assembly, and the enclosure Type, components, markings, and construction must remain within that certification scope.<\/p><\/div><\/div><\/div><\/div><\/div><\/div><\/section><\/div><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-113d721 elementor-widget elementor-widget-text-editor\" data-id=\"113d721\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Conclusion<\/h2><p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-65317\" title=\"Panelboards can include AFCI and GFCI to reduce hazards\" src=\"http:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Panelboards-can-include-AFCI-and-GFCI-to-reduce-hazards.webp\" alt=\"Panelboards can include AFCI and GFCI to reduce hazards\" width=\"500\" height=\"374\" srcset=\"https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Panelboards-can-include-AFCI-and-GFCI-to-reduce-hazards.webp 1269w, https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Panelboards-can-include-AFCI-and-GFCI-to-reduce-hazards-500x374.webp 500w, https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/01\/Panelboards-can-include-AFCI-and-GFCI-to-reduce-hazards-16x12.webp 16w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p><p class=\"p1\">Three-phase panelboard selection requires more than amperage and circuit count. A reliable specification must coordinate the electrical system, calculated load, main and bus ratings, breaker schedule, neutral, ground, enclosure, available fault current, SCCR, listing, and project documents.<\/p><p class=\"p1\">For a custom panelboard enclosure project, <a href=\"https:\/\/www.eabel.com\/contact\/\" target=\"_blank\" rel=\"noopener\"><strong>contact E-Abel<\/strong><\/a> with your one-line diagram, panel schedule, fault-current requirement, enclosure conditions, and certification needs. Our team can help review the enclosure requirements, identify dimensional or environmental conflicts, and prepare a custom enclosure proposal based on the actual project conditions.<\/p><h2>Related Reading<\/h2><p><a href=\"https:\/\/www.eabel.com\/electrical-panel-vs-breaker-box\/\" target=\"_blank\" rel=\"noopener noreferrer\">Electrical Panel vs Breaker Box: Key Differences<\/a><\/p><p><a href=\"https:\/\/www.eabel.com\/distribution-board-types-explained\/\" target=\"_blank\" rel=\"noopener noreferrer\">10 Distribution Board Types Explained<\/a><\/p><p><a href=\"https:\/\/www.eabel.com\/indoor-vs-outdoor-circuit-breakers\/\" target=\"_blank\" rel=\"noopener noreferrer\">Indoor vs Outdoor Circuit Breakers: Key Differences<\/a><\/p><p><a href=\"https:\/\/www.eabel.com\/industrial-enclosures-materials\/\" target=\"_blank\" rel=\"noopener noreferrer\">Selecting the Right Materials for Industrial Enclosures<\/a><\/p><p><a href=\"https:\/\/www.eabel.com\/electrical-enclosure-accessories-guide\/\" target=\"_blank\" rel=\"noopener noreferrer\">Electrical Enclosure Accessories: Types and Selection<\/a><\/p><p><a href=\"https:\/\/www.eabel.com\/electrical-enclosure-safety-risks-standards-best-practices\/\" target=\"_blank\" rel=\"noopener noreferrer\">Electrical Enclosure Safety: Risks and Best Practices<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>\u0e40\u0e23\u0e35\u0e22\u0e19\u0e23\u0e39\u0e49\u0e27\u0e34\u0e18\u0e35\u0e40\u0e25\u0e37\u0e2d\u0e01\u0e41\u0e1c\u0e07\u0e08\u0e48\u0e32\u0e22\u0e44\u0e1f\u0e2a\u0e32\u0e21\u0e40\u0e1f\u0e2a\u0e15\u0e32\u0e21\u0e41\u0e23\u0e07\u0e14\u0e31\u0e19 \u0e1e\u0e34\u0e01\u0e31\u0e14\u0e1a\u0e31\u0e2a\u0e1a\u0e32\u0e23\u0e4c \u0e0a\u0e19\u0e34\u0e14\u0e2d\u0e38\u0e1b\u0e01\u0e23\u0e13\u0e4c\u0e40\u0e21\u0e19 \u0e01\u0e32\u0e23\u0e08\u0e31\u0e14\u0e27\u0e32\u0e07\u0e40\u0e1a\u0e23\u0e01\u0e40\u0e01\u0e2d\u0e23\u0e4c \u0e04\u0e48\u0e32 SCCR \u0e15\u0e39\u0e49 \u0e41\u0e25\u0e30\u0e01\u0e32\u0e23\u0e1b\u0e0f\u0e34\u0e1a\u0e31\u0e15\u0e34\u0e15\u0e32\u0e21 UL 67<\/p>","protected":false},"author":17,"featured_media":70693,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[80],"tags":[],"class_list":["post-70672","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Learn how to select a three-phase panelboard by voltage, bus rating, main type, breaker layout, SCCR, enclosure, and UL 67 compliance.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Jie Lian\"\/>\n\t<meta name=\"google-site-verification\" content=\"1wYrj2wMR08VkFVPekPDygcLhkejwyc4Tx5iltGVzdk\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"th_TH\" \/>\n\t\t<meta property=\"og:site_name\" content=\"E-Abel -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Three-Phase Panelboard Specifications Guide - E-Abel\" \/>\n\t\t<meta property=\"og:description\" content=\"Learn how to select a three-phase panelboard by voltage, bus rating, main type, breaker layout, SCCR, enclosure, and UL 67 compliance.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/09\/Three-phase-panelboard-specifications-guide.webp\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/09\/Three-phase-panelboard-specifications-guide.webp\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1448\" \/>\n\t\t<meta property=\"og:image:height\" content=\"1086\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-09-10T02:56:20+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-09-11T06:00:44+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Three-Phase Panelboard Specifications Guide - E-Abel\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Learn how to select a three-phase panelboard by voltage, bus rating, main type, breaker layout, SCCR, enclosure, and UL 67 compliance.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/09\/Three-phase-panelboard-specifications-guide.webp\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/three-phase-panelboard-specifications\\\/#blogposting\",\"name\":\"Three-Phase Panelboard Specifications Guide - E-Abel\",\"headline\":\"Three-Phase Panelboard Specifications Guide\",\"author\":{\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/author\\\/jay\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.eabel.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Three-phase-panelboard-specifications-guide.webp\",\"width\":1448,\"height\":1086,\"caption\":\"Three phase panelboard specifications guide\"},\"datePublished\":\"2026-09-10T02:56:20+00:00\",\"dateModified\":\"2026-09-11T06:00:44+00:00\",\"inLanguage\":\"th\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/three-phase-panelboard-specifications\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/three-phase-panelboard-specifications\\\/#webpage\"},\"articleSection\":\"Blog\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/three-phase-panelboard-specifications\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/#listItem\",\"position\":1,\"name\":\"E-able\",\"item\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/category\\\/blog\\\/#listItem\",\"name\":\"Blog\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/category\\\/blog\\\/#listItem\",\"position\":2,\"name\":\"Blog\",\"item\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/category\\\/blog\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/three-phase-panelboard-specifications\\\/#listItem\",\"name\":\"Three-Phase Panelboard Specifications Guide\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/#listItem\",\"name\":\"E-able\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/three-phase-panelboard-specifications\\\/#listItem\",\"position\":3,\"name\":\"Three-Phase Panelboard Specifications Guide\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/category\\\/blog\\\/#listItem\",\"name\":\"Blog\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/#organization\",\"name\":\"E-Abel\",\"url\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/\",\"telephone\":\"+8618860978683\",\"foundingDate\":\"2008-08-28\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"value\":150},\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.eabel.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/043b221a8891a285b2aaa66333022ef.png\",\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/three-phase-panelboard-specifications\\\/#organizationLogo\",\"width\":2560,\"height\":1301,\"caption\":\"E-Abel logo form\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/three-phase-panelboard-specifications\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/author\\\/jay\\\/#author\",\"url\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/author\\\/jay\\\/\",\"name\":\"Jie Lian\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/three-phase-panelboard-specifications\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/bce0af75a87455b7769d969e8e874d9502e34e10641eb2731332f2f68c04c1cc?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Jie Lian\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/three-phase-panelboard-specifications\\\/#webpage\",\"url\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/three-phase-panelboard-specifications\\\/\",\"name\":\"Three-Phase Panelboard Specifications Guide - E-Abel\",\"description\":\"Learn how to select a three-phase panelboard by voltage, bus rating, main type, breaker layout, SCCR, enclosure, and UL 67 compliance.\",\"inLanguage\":\"th\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/three-phase-panelboard-specifications\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/author\\\/jay\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/author\\\/jay\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.eabel.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Three-phase-panelboard-specifications-guide.webp\",\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/three-phase-panelboard-specifications\\\/#mainImage\",\"width\":1448,\"height\":1086,\"caption\":\"Three phase panelboard specifications guide\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/three-phase-panelboard-specifications\\\/#mainImage\"},\"datePublished\":\"2026-09-10T02:56:20+00:00\",\"dateModified\":\"2026-09-11T06:00:44+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/#website\",\"url\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/\",\"name\":\"E-Abel\",\"inLanguage\":\"th\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.eabel.com\\\/th\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Three-Phase Panelboard Specifications Guide - E-Abel<\/title>\n\n","aioseo_head_json":{"title":"\u0e04\u0e39\u0e48\u0e21\u0e37\u0e2d\u0e02\u0e49\u0e2d\u0e01\u0e33\u0e2b\u0e19\u0e14\u0e41\u0e1c\u0e07\u0e08\u0e48\u0e32\u0e22\u0e44\u0e1f\u0e2a\u0e32\u0e21\u0e40\u0e1f\u0e2a - E-Abel","description":"\u0e40\u0e23\u0e35\u0e22\u0e19\u0e23\u0e39\u0e49\u0e27\u0e34\u0e18\u0e35\u0e40\u0e25\u0e37\u0e2d\u0e01\u0e41\u0e1c\u0e07\u0e08\u0e48\u0e32\u0e22\u0e44\u0e1f\u0e2a\u0e32\u0e21\u0e40\u0e1f\u0e2a\u0e15\u0e32\u0e21\u0e41\u0e23\u0e07\u0e14\u0e31\u0e19 \u0e1e\u0e34\u0e01\u0e31\u0e14\u0e1a\u0e31\u0e2a\u0e1a\u0e32\u0e23\u0e4c \u0e0a\u0e19\u0e34\u0e14\u0e2d\u0e38\u0e1b\u0e01\u0e23\u0e13\u0e4c\u0e40\u0e21\u0e19 \u0e01\u0e32\u0e23\u0e08\u0e31\u0e14\u0e27\u0e32\u0e07\u0e40\u0e1a\u0e23\u0e01\u0e40\u0e01\u0e2d\u0e23\u0e4c \u0e04\u0e48\u0e32 SCCR \u0e15\u0e39\u0e49 \u0e41\u0e25\u0e30\u0e01\u0e32\u0e23\u0e1b\u0e0f\u0e34\u0e1a\u0e31\u0e15\u0e34\u0e15\u0e32\u0e21 UL 67","canonical_url":"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1wYrj2wMR08VkFVPekPDygcLhkejwyc4Tx5iltGVzdk","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/#blogposting","name":"Three-Phase Panelboard Specifications Guide - E-Abel","headline":"Three-Phase Panelboard Specifications Guide","author":{"@id":"https:\/\/www.eabel.com\/th\/author\/jay\/#author"},"publisher":{"@id":"https:\/\/www.eabel.com\/th\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/09\/Three-phase-panelboard-specifications-guide.webp","width":1448,"height":1086,"caption":"Three phase panelboard specifications guide"},"datePublished":"2026-09-10T02:56:20+00:00","dateModified":"2026-09-11T06:00:44+00:00","inLanguage":"th","mainEntityOfPage":{"@id":"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/#webpage"},"isPartOf":{"@id":"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/#webpage"},"articleSection":"Blog"},{"@type":"BreadcrumbList","@id":"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.eabel.com\/th\/#listItem","position":1,"name":"E-able","item":"https:\/\/www.eabel.com\/th\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.eabel.com\/th\/category\/blog\/#listItem","name":"Blog"}},{"@type":"ListItem","@id":"https:\/\/www.eabel.com\/th\/category\/blog\/#listItem","position":2,"name":"Blog","item":"https:\/\/www.eabel.com\/th\/category\/blog\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/#listItem","name":"Three-Phase Panelboard Specifications Guide"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.eabel.com\/th\/#listItem","name":"E-able"}},{"@type":"ListItem","@id":"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/#listItem","position":3,"name":"Three-Phase Panelboard Specifications Guide","previousItem":{"@type":"ListItem","@id":"https:\/\/www.eabel.com\/th\/category\/blog\/#listItem","name":"Blog"}}]},{"@type":"Organization","@id":"https:\/\/www.eabel.com\/th\/#organization","name":"E-Abel","url":"https:\/\/www.eabel.com\/th\/","telephone":"+8618860978683","foundingDate":"2008-08-28","numberOfEmployees":{"@type":"QuantitativeValue","value":150},"logo":{"@type":"ImageObject","url":"https:\/\/www.eabel.com\/wp-content\/uploads\/2022\/05\/043b221a8891a285b2aaa66333022ef.png","@id":"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/#organizationLogo","width":2560,"height":1301,"caption":"E-Abel logo form"},"image":{"@id":"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/www.eabel.com\/th\/author\/jay\/#author","url":"https:\/\/www.eabel.com\/th\/author\/jay\/","name":"Jie Lian","image":{"@type":"ImageObject","@id":"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/bce0af75a87455b7769d969e8e874d9502e34e10641eb2731332f2f68c04c1cc?s=96&d=mm&r=g","width":96,"height":96,"caption":"Jie Lian"}},{"@type":"WebPage","@id":"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/#webpage","url":"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/","name":"Three-Phase Panelboard Specifications Guide - E-Abel","description":"Learn how to select a three-phase panelboard by voltage, bus rating, main type, breaker layout, SCCR, enclosure, and UL 67 compliance.","inLanguage":"th","isPartOf":{"@id":"https:\/\/www.eabel.com\/th\/#website"},"breadcrumb":{"@id":"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/#breadcrumblist"},"author":{"@id":"https:\/\/www.eabel.com\/th\/author\/jay\/#author"},"creator":{"@id":"https:\/\/www.eabel.com\/th\/author\/jay\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/09\/Three-phase-panelboard-specifications-guide.webp","@id":"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/#mainImage","width":1448,"height":1086,"caption":"Three phase panelboard specifications guide"},"primaryImageOfPage":{"@id":"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/#mainImage"},"datePublished":"2026-09-10T02:56:20+00:00","dateModified":"2026-09-11T06:00:44+00:00"},{"@type":"WebSite","@id":"https:\/\/www.eabel.com\/th\/#website","url":"https:\/\/www.eabel.com\/th\/","name":"E-Abel","inLanguage":"th","publisher":{"@id":"https:\/\/www.eabel.com\/th\/#organization"}}]},"og:locale":"th_TH","og:site_name":"E-Abel -","og:type":"article","og:title":"Three-Phase Panelboard Specifications Guide - E-Abel","og:description":"Learn how to select a three-phase panelboard by voltage, bus rating, main type, breaker layout, SCCR, enclosure, and UL 67 compliance.","og:url":"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/","og:image":"https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/09\/Three-phase-panelboard-specifications-guide.webp","og:image:secure_url":"https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/09\/Three-phase-panelboard-specifications-guide.webp","og:image:width":1448,"og:image:height":1086,"article:published_time":"2026-09-10T02:56:20+00:00","article:modified_time":"2026-09-11T06:00:44+00:00","twitter:card":"summary_large_image","twitter:title":"Three-Phase Panelboard Specifications Guide - E-Abel","twitter:description":"Learn how to select a three-phase panelboard by voltage, bus rating, main type, breaker layout, SCCR, enclosure, and UL 67 compliance.","twitter:image":"https:\/\/www.eabel.com\/wp-content\/uploads\/2026\/09\/Three-phase-panelboard-specifications-guide.webp"},"aioseo_meta_data":{"post_id":"70672","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":true,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2026-09-11 06:02:24","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-08-31 06:05:33","updated":"2026-09-23 17:58:34","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.eabel.com\/th\/\" title=\"E-able\">E-able<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.eabel.com\/th\/category\/blog\/\" title=\"Blog\">Blog<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tThree-Phase Panelboard Specifications Guide\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"E-able","link":"https:\/\/www.eabel.com\/th\/"},{"label":"Blog","link":"https:\/\/www.eabel.com\/th\/category\/blog\/"},{"label":"Three-Phase Panelboard Specifications Guide","link":"https:\/\/www.eabel.com\/th\/three-phase-panelboard-specifications\/"}],"_links":{"self":[{"href":"https:\/\/www.eabel.com\/th\/wp-json\/wp\/v2\/posts\/70672","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eabel.com\/th\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eabel.com\/th\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eabel.com\/th\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eabel.com\/th\/wp-json\/wp\/v2\/comments?post=70672"}],"version-history":[{"count":0,"href":"https:\/\/www.eabel.com\/th\/wp-json\/wp\/v2\/posts\/70672\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eabel.com\/th\/wp-json\/wp\/v2\/media\/70693"}],"wp:attachment":[{"href":"https:\/\/www.eabel.com\/th\/wp-json\/wp\/v2\/media?parent=70672"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eabel.com\/th\/wp-json\/wp\/v2\/categories?post=70672"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eabel.com\/th\/wp-json\/wp\/v2\/tags?post=70672"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}