A quote-ready custom load center RFQ defines the electrical system, breaker schedule, fault-current requirements, enclosure, installation interface, documents, and commercial terms. It also separates confirmed data from supplier-dependent items. Otherwise, vendors can quote different equipment and still appear compliant.
Its purpose is to remove unknowns affecting compliance, dimensions, price, or delivery after award—not prescribe manufacturing details.
Key Takeaways
- Confirm the equipment category and quote stage before requesting a custom design.
- State voltage, phase, wire count, main ratings, branch circuits, and grounding as one coordinated schedule.
- Keep available fault current, panelboard short-circuit current rating (SCCR), and breaker interrupting ratings separate.
- Define the enclosure environment, mounting, dimensions, cable entry, and conductor interface.
- Require suppliers to disclose deviations, assumptions, price effects, and the event that starts the lead-time clock.
Define the Equipment, RFQ Stage, and Responsibilities
Start with the assembly’s primary function; a catalog name does not establish its product category or listing.
Confirm the Equipment Category
In North American practice, a “load center” is a type of panelboard, not a separate UL or NEC equipment class. It usually means a smaller panelboard using plug-on breakers. Do not classify equipment by ampere rating, cabinet size, or location. When the scope is unclear, require the bidder to state the proposed product category, governing standard, and certification scope. This comparison of UL 508A, UL 67, and UL 891 can help resolve the boundary.
| Request type | Use it when | Required RFQ response |
|---|---|---|
| Standard load center | A catalog configuration meets the electrical and enclosure needs | Manufacturer, series, catalog configuration, and permitted options |
| Custom load center or enclosed panelboard | Breaker layout, enclosure, labeling, or interfaces require project-specific work | Exact custom scope and listing status of the completed equipment |
| Switchboard | The specified construction is a dead-front switchboard, commonly used for centralized distribution | Proposed switchboard standard, arrangement, ratings, and access |
| Industrial control panel | Process or machine control is the assembly’s primary function | Control-panel standard, power circuits, control functions, and system boundaries |
State the Required Quote Status
Classify the request as budgetary, firm, or release-ready. A budgetary quote may use disclosed provisional values; a firm quote needs settled cost and schedule inputs. Release for manufacture should follow drawing approval and closure of options and changes. Mark unfinished values “TBD,” assign an owner, and set a confirmation date.
Assign Design and Approval Responsibilities
The buyer or engineer of record provides or coordinates the system data, load calculations, site conditions, project location, applicable installation code and edition, utility requirements, and design basis. The supplier verifies its proposal against those inputs and controls product selection, internal layout, manufacturing drawings, component compatibility, and deviations. State who performs fault-current and coordination studies, reviews submittals, and may approve substitutions.
Do not ask the manufacturer to guarantee approval by the authority having jurisdiction (AHJ) or utility. Require the drawings, markings, and certification records needed for review.

Specify Electrical Ratings and Circuit Requirements
Put the technical inputs in one controlled schedule so every bidder selects the bus, main device, branch breakers, neutral, terminals, and options from the same basis.
| RFQ field | What to state | Common quoting risk |
|---|---|---|
| Supply system | Nominal voltage, phase, wire count, frequency, and grounding configuration | A request such as “208 V panel” does not identify the full system |
| Equipment role | Service equipment or downstream distribution; main breaker, main lugs, or other main arrangement | Grounding, bonding, disconnect, and marking requirements remain unclear |
| Ampere ratings | Panelboard bus rating, main-device rating, and continuous-load basis when relevant | The bus and main breaker are assumed to have the same rating |
| Short-circuit basis | Available fault current at the line terminals, required panelboard SCCR, breaker interrupting ratings, and any permitted series combination | One value is incorrectly applied to the site, assembly, and every breaker |
| Branch circuits | Circuit ID, load, voltage, poles, breaker amperes, and required protection | Vendors choose different breaker counts or trip functions |
| Capacity plan | Installed breakers, spare breakers, unused spaces, and identified future loads | “Spare capacity” is interpreted in different ways |
| Bus and grounding | Bus material, neutral rating, equipment ground bar, isolated ground, and bonding requirements | Neutral or grounding details are left for field correction |
| Terminations | Conductor material, size, quantity per phase, number per terminal, lug range, and feed direction | The specified cable will not fit or reach the terminals |
| Conditional interfaces | Surge protective device (SPD), metering, monitoring, identified generator interlock, or provisions for PV, battery storage, and EV load management | A feature is added without defining its control, interconnection, or listing conditions |
120/240 V single-phase, three-wire and 208Y/120 V three-phase, four-wire systems use different bus and circuit arrangements. Resolve the source before the final quote; this 120/240 V versus 208Y/120 V guide explains the distinction. If power transfer is a primary function, specify transfer equipment separately instead of treating it as a generic panel accessory.
Separate Fault-Current Inputs from Equipment Ratings
Available fault current is a site condition. Panelboard SCCR applies to the complete assembly under its marked conditions, while interrupting rating applies to a protective device. At the installation point, available fault current must not exceed the panelboard’s applicable marked SCCR. Each protective device must also be applied within its individual interrupting rating or an identified series-combination rating.
The Panelboard Application Guide explains that a panelboard’s marked SCCR accounts for both overcurrent-device performance and the bus structure. The assembly rating can be limited by the lowest interrupting rating of an installed device unless an identified series combination applies.
For a series-rated combination, require the exact upstream and downstream devices, voltage, phase, and rating conditions. Use “interrupting rating” for breakers and “SCCR” for the panelboard; do not give the complete assembly a generic “AIC” value.
Selective coordination is separate. Include it only when the project, system design, or applicable code requires it, and assign responsibility for the study and final device settings or combinations.
Make the Branch-Circuit Schedule Quote-Ready
Specify the permitted breaker manufacturer, series, and mounting style; matching ratings do not make breakers interchangeable unless the panelboard marking identifies them for use. Record required ground-fault circuit interrupter (GFCI), arc-fault circuit interrupter (AFCI), ground-fault protection of equipment (GFPE), shunt-trip, and other functions in the circuit schedule. Separate spare breakers from empty spaces, and permit tandem or quad breakers only when the marking allows the exact combination.
Base the schedule on project load work, not a supplier estimate. Resolve unfinished feeder and branch circuit design before manufacturing release.

Define the Enclosure and Installation Interface
Translate site conditions into measurable requirements. State the indoor or outdoor location, mounting method, ambient temperature range, and altitude. Identify exposure to rain, windblown dust, hose-directed water or washdown, corrosion, sunlight, and condensation. Specify NEMA enclosure Type separately from material and finish. The NEMA enclosure-type descriptions define environmental protection conditions; stainless steel or heavier-gauge metal alone does not establish a Type rating.
Provide maximum dimensions, mounting points, wall opening or trim dimensions, door swing, access direction, and nearby clearance limits. For a retrofit, include photographs, the existing nameplate, conduit locations, and fixed obstructions. Electrically correct equipment can still fail if it will not fit or align with existing raceways.
State top or bottom entry, available conductor length, conductor material and size, conductors per phase, terminal orientation, and required bending or pulling space. A wide lug range does not prove that the planned conductor count and routing will fit.
For commercial or industrial projects, state any seismic qualification and anchorage requirements. Assign responsibility for arc-flash study inputs and equipment labels rather than assuming they are included in the manufacturer’s standard scope.
When a catalog configuration cannot meet these interfaces, Eabel’s custom load centers can support project-specific main arrangements, circuit capacities, breaker configurations, mounting methods, and enclosure options. Require written confirmation of how the changes affect ratings, breaker compatibility, and certification scope.
Identify Drawings, Listings, and Acceptance Deliverables
The buyer-issued package establishes the quote basis; the supplier submittal proves what is offered.
Control the Buyer-Issued Documents
Attach the latest single-line diagram, panel schedule, plans or elevations, specification, site photographs, and utility requirements. Give every file a number, revision, and issue date.
State document precedence. If the schedule conflicts with the one-line or specification, require written clarification before the bid deadline and record any unresolved assumption in the quote.
Ask for the Right Listing and Marking Evidence
When UL 67 is required, request evidence that the completed configuration—not only its breakers, bus, or enclosure—is covered by the applicable panelboard certification. Ask for the certification organization, product category or control number where applicable, file or listing number, and finished-equipment markings. The active UL 67 standard page identifies the fourteenth edition, published July 31, 2026, and its circuit-control and protection scope.
State the project-required standard and ask which edition the offered certification is based on. A newly published edition does not automatically amend an issued specification or expand an existing certification. For service equipment, request the applicable “Suitable for Use as Service Equipment” marking. Also require nameplate voltage, current, SCCR, enclosure Type, and any limits on field-installed devices.
Molded-case breakers may be evaluated under UL 489, but compliant components do not certify a customized load center.
Define Supplier Submittals and Acceptance
Define the documents required with the bid, for approval, at manufacturing release, and before shipment. Request a general arrangement drawing, proposed breaker schedule, product data, nameplate and label details, applicable wiring information, installation instructions, and certification evidence. State the file format, language, review cycle, and documents that must reach final as-built status. Request a bill of materials only when the contract requires one.
Where supplier qualification affects the award, request current, verifiable evidence relevant to the project, such as the applicable quality-management certificate, inspection records, and contract-required traceability. Do not require a complex factory acceptance test by default. State project-specific inspection, witness, report, or photo requirements and ask the supplier to describe standard production checks. Acceptance should confirm that drawings, ratings, labels, accessories, and deviations match the purchase order. AHJs, utilities, owners, and contractors still have separate roles in electrical panel energization approval.

Set Commercial Terms and the Supplier Response Format
A technical RFQ can still produce misleading comparisons when bidders use different commercial assumptions. Define the response format before quotations arrive.
Make Price and Schedule Comparisons Fair
State quantity, currency, destination, shipping term and named place, requested ship or on-site date, quote validity, payment terms, and warranty duration, coverage, and start event. Require separate prices for base equipment, options, engineering, tooling, submittals, testing or certification, packaging, freight, taxes, duties, and field services where applicable. Require all inclusions and exclusions to be listed.
For international or multi-unit shipments, define export packaging, pallet and carton labels, shipment splits, moisture protection, and the records required to document transit damage.
Define whether lead time starts at purchase order, completed clarification, approved submittal, deposit, or manufacturing release. Require separate submittal, manufacturing, and transit times, plus identification of schedule-sensitive components or approvals.
Control Substitutions and Changes
State the basis of design and whether approved equals are allowed. A substitute response should compare dimensions, breaker compatibility, SCCR, listing, accessories, and delivery. “Equivalent” does not permit an undisclosed change.
After drawing approval, require written changes showing the effect on price, documents, certification work, and delivery.
For prototype or repeat-order programs, define first-article approval, the controlling drawing and configuration revision, approved substitutions, and the notice required for component obsolescence before volume or repeat production.
Require a Compliance Matrix and Assumptions Register
Require a line-by-line response showing the requirement ID, compliance status, deviation, assumption, price impact, schedule impact, and date by which the buyer must confirm any open item. A blank response is not compliance, and a “no exceptions” statement must cover the complete controlled RFQ package.
Use the matrix to normalize bids before comparing total evaluated cost, technical compliance, delivery, warranty, and unresolved risk. A lower base price is not the better offer when required scope is excluded or priced as an option. Close each open item or assign an owner and due date before award.
Custom Load Center RFQ Checklist
Use this checklist as the RFQ front sheet; keep exact values in controlled schedules and drawings.
- Project and quote: Name, location, application, quantity, equipment category, installation code and edition, utility requirements, quote status, responsibilities, and bid due date.
- Electrical: Supply and grounding, equipment role, main configuration, bus rating, available fault current, SCCR, permitted breaker series, circuit schedule, spares and spaces, neutral and ground, terminals, SPD, metering, and alternate-source requirements.
- Enclosure and site: Location, NEMA Type, material, finish, ambient range, altitude, exposures, mounting, dimensions, access limits, cable entry, conductor data, applicable seismic or anchorage requirements, and retrofit records.
- Documents and compliance: Controlled drawings and specifications, revision precedence, certification details, required markings, submittal stages, as-built records, inspections, tests, acceptance criteria, and applicable arc-flash responsibilities.
- Commercial and supplier response: Currency, base and option prices, inclusions and exclusions, packaging and shipment records, freight, taxes and duties, payment, warranty, requested date, lead-time trigger, change rules, first-article or repeat-order controls, compliance matrix, deviations, assumptions, and cost or schedule effects.
Mark unknown fields “TBD,” assign an owner and due date, and state whether each item blocks a firm quote or manufacturing release. Never leave critical fields blank.

FAQs About Custom Load Center RFQs
What information is needed for a custom load center quote?
Provide the supply voltage, phase, wire count, grounding system, bus and main ratings, breaker schedule, available fault current, required SCCR, enclosure conditions, conductor details, quantity, drawings, and requested delivery date.
Can I request a firm quote before the breaker schedule is final?
A budgetary quote can use clearly identified provisional values. A firm quote requires the breaker schedule, main configuration, enclosure interfaces, certification requirements, and other cost-sensitive details to be settled.
Can a custom load center be UL 67 certified?
Yes, if the completed configuration falls within the manufacturer’s applicable UL 67 certification scope and carries the required markings. Using UL-certified breakers or enclosures does not automatically certify the finished assembly.
What short-circuit information should a load center RFQ include?
State the available fault current at the installation point, required panelboard SCCR, breaker interrupting ratings, and any permitted series-rated combination. Do not use “AIC” as a general rating for the complete assembly.
Are breakers with the same ampere rating interchangeable?
No. Matching ampere and voltage ratings do not make breakers interchangeable. Specify the permitted manufacturer, series, mounting style, poles, interrupting rating, and protection functions identified for use with the selected panelboard.
What determines custom load center lead time?
Lead time depends on drawing approval, confirmed breaker availability, custom enclosure work, certification requirements, production capacity, and shipping. The RFQ should state whether lead time begins at purchase order, deposit, approved submittal, or manufacturing release.
Conclusion

A strong custom load center RFQ gives every bidder one baseline for system data, ratings, interfaces, documents, responsibilities, price, and schedule—without taking over the manufacturer’s design work.
To discuss your project, contact our team with the one-line diagram, breaker schedule, enclosure requirements, site constraints, quantity, and requested delivery date. We can review the package, identify missing inputs, and help prepare it for a clear, comparable quotation.
Related Reading
Three-Phase Panelboard Specifications Guide
Eaton CH vs BR: Breakers and Load Centers Compared
Electrical Panel vs Breaker Box: Key Differences
Distribution Panel: Parts, Types and Selection